Factory Wholesale Ready To Ship Ceramic Plate Hair Straightener Curling Irons Hair Dryer And Volumizer
Quick Details
After-sales Service | Return and Replacement | Warranty: | 1 YEAR, 1 Year |
Application: | HOTEL, Commercial, HOUSEHOLD | Power Source: | Electric |
Plate Type: | CERAMIC COATING | Display: | LED |
Certification: | CE/RoHS/ETL/CETL | Power: | 50-60W |
Voltage: | 110~240V 50~60Hz | Heater: | MCH/PTC |
Power cord: | 2.5meter 360 Swivel Cord | Plate size: | 1 INCH |
Plug: | EU/US Plug(can Customized) | Weight: | 0.7kg |
Supply Ability
Supply Ability:
200000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Color box
Port
Guangzhou/Shenzhen
Lead Time :
Quantity(Pieces) | 1 - 1 | >1 |
Est. Time(days) | 7 | To be negotiated |
Product Paramenters
Type | Hair Straightener |
Voltage | 110V-240V,50/60Hz |
Power | 50W |
Display | LED |
Plate type | Tourmaline ceramic Coating |
Heater | Fast PTC Heater |
Plug | USA110V, EU 220V, UK 240V, JP100V, AU230V |
Power cord | 360 degree swivel cord,2.5m (8.2 feet) |
Temperature | 250ºC/450°F(+/-10 degrees) 130-230°C |
auto shut off | 60 minutes |
Single Package | 35*10*5cm |
Single Weight | 0.62kg |
MEAS | 41.5*35.5*27cm |
G.W | 13.5kg |
PCS/CTN | 20pcs |
Sea Port | Guangzhou/Shenzhen |
Customized logo | 500pcs |
OEM & ODM | Welcome! |
FAQ
1. Are you a factory or trading company?
--- As a factory, we are specialized in manufacturing hair styling tools for 8 years.
2. Can you print client's logo?
--- Yes, we can print client's logo.
3. Do you accept trial order of small quantity?
--- Yes, we do accept when we have stock of materials.
4. What quote do you offer?
--- FOB, CIF and others ways according to your needs. When the quality is same, our price can be more competitive.
5. How to pay?
--- We accept payment by T/T, L/C, Western Union, Alibaba Secure Payment, D/A, D/P etc.
6.How can you guarantee the quality of your products?
--- We have strict quality control system, in order to ensure the quality of our products, all the finished products should be checked and tested before packing.
7. How about the lead time for mass production?
--- Generally, the lead time is 15-35 days after getting the confirmation of the order and deposit.
8.Do you provide after-sales service?
--- Yes, please kindly contact us at any time.